Amalgamation of M’luru-Madgaon Intercity and….

Spread the love

Amalgamation of M’luru-Madgaon Intercity and….

Amalgamation of M’luru-Madgaon Intercity & Byndoor Passenger Soon

Mangaluru: Even though the Mangaluru Central Station-Madgaon Intercity Express, and the Kasaragod -Mookambika Road Byndoor-Kasaragod Express were being operated against popular demand, but unfortunately both trains are running under loss Therefore, the Palakkad Division of Southern Railway has recommended to the Railway Board amalgamation of these two loss-making trains, to run as Kasaragod-Madgaon-Kasargod service.

image002madgaon-intercity-express-20160903-002

Since its launch on February 24, 2014, the Intercity Express ((22636/22635)) had not been getting passenger patronage as it did not match the requirements of travelling public either from Mangaluru or Madgaon. Against the demand for an express train leaving Vasco-da-Gama in the morning to reach Mangaluru in the afternoon, the Southern Railway had introduced the service leaving Mangaluru in the morning hours (8.15 am reaching Madgaon around 3.45-4 pm) to Madgaon amidst availability of several other trains during the same time.

Similar was the case with Kasaragod-Mookambika Road Byndoor Passenger (56665/56666) train, which was introduced in February 2015. As against the demand to route the train via Mangaluru Central Station, the SR skipped the Central on the ground that the process would consume more time. As such, the train remained of little use to those visiting Mangaluru City, both from Kasaragod and Byndoor, and lacked patronage.

image001madgaon-intercity-express-20160903-001

After operating the trains against popular wishes and incurring heavy loss, the SR now appears to have decided to amalgamate these trains. The proposal is to start the amalgamated train towards Madgaon at around 10 a.m. from Mangaluru Central since there are no trains between 9 a.m. and noon on the sector. The running time of the train too is expected to be reduced after the amalgamation.

In the meantime there are suggestion to extend the Train up to Vasco-da-Gama (Goa) since there is no direct train connectivity between Mangaluru and Vasco. The reason behind being that hundreds of people of Mangaluru origin reside in Vasco and the train would not only be beneficial to them, but also would receive good patronage. The final decision is yet to be taken by Southern Railways authorities.

image003madgaon-intercity-express-20160903-003

It is also noted that timing and nature of the amalgamated train [whether Express or Passenger] are yet to be finalized, and will be done at the earliest..The Byndoor-Kasaragod Passenger runs up to Kannur as a special train since there is no maintenance facility at Kasaragod. The special train, which now leaves at around 4 a.m, would be made to leave Kannur at 6 a.m. to reach Mangaluru Central at around 10 a.m and reach Madgaon in the afternoon. The return timings are yet to be finalized. Regarding the demand to extend it up to Vasco is still under consideration.

Also Read related Articles :

No More AC Chair Car on M’luru-Madagaon Express


Spread the love